CHUMART CM-54RS: dA (flashing on display)
⚡ Bench Triage & Meter Telemetry
VISUAL / BENCH CHECK
01 // Observed Condition
Door open alarm
02 // Non-Invasive Meter / Bench Verification
Close door firmly; inspect door switch plunger and hinge alignment.
Platform / OEM Cross-Reference: CHUMART's reach-in maintenance schedule (daily temp log, weekly gasket/drain check, 30–90 day condenser cleaning)